Design system · Asas

The components sheet

Every shared piece, live on the demo’s data: light limestone, white cards, graphite ink, and ONE signature colour — ultramarine — given to the key action, the live element and the current place, nothing else. No ornament: the beauty is in spacing, type and detail.

Identity

The company’s name as a wordmark, a simple geometric «ب», and the platform’s name «Asas»

Binaa Al-Insan wal-Umran Holding
AsasBoard governance

Colour

Every colour is a token with a role; text reads at 7:1 on every surface, light and dark

  • Aa--canvas
  • Aa--surface
  • Aa--sunken
  • Aa--ink
  • Aa--ink-3
  • Aa--brand
  • Aa--brand-soft
  • Aa--deep

Type

Alexandria for titles, IBM Plex Sans Arabic for text, Inter for every figure and Latin run

The fourth board meeting

Directors read the pack on the iPad, vote, and sign the minutes without paper.

03:01:00FiguresD/2026/031 · M/2026/04Reference

Shape language

Quiet cards, soft corners, meter rings, round pills

  • Ultramarine night

    The sign-in panel and the provider only

  • 030058

    Countdown

    Large, light, tabular figures

  • M/2026/0410:0026.11.202616.06.1448 AH

    Facts strip

    A meeting’s or a document’s facts in one card

  • 75%5/6

    Meter ring

    Readiness, attendance against the quorum, a state

  • Glow

    A touch of ultramarine behind the hero card only

Buttons

One signature button per screen; the rest are quiet

The chair signs first — Eng. Abdulaziz Al-Rashed

States & badges

Every state carries its word, never its colour alone

Meeting

DraftScheduledPack sentIn sessionClosed

Vote

ForAgainstAbstainRecused — conflict of interest

Minutes

DraftWith the directors for commentSigning 4 of 6Signed

Fields

Crisp rectangles, the label above

Presenter

Item kind

Only the secretary sees it

Navigation

The floating command bar, the workspace switcher and tabs

The workspace switcher — previewed with illustrative bodies

Cards & documents

White surfaces on stone, a hairline and a low shadow; precious ones carry corner marks

Minutes of the third meeting of the Board of Managers28 October 2026 · 9 pages
Eng. Abdulaziz Fahd Al-RashedDr. Sultan Nasser Al-OtaibiDr. Haifa Mohammed Al-ZahraniKhalid Ibrahim Al-SubaieAbdullah Mohammed Al-AnaziReem Abdulrahman Al-ShehriEng. Saud Khalid Al-QarniDr. Munira Hamad Al-AbdulkarimEng. Badr Nasser Al-HamdanHind Sulaiman Al-RasheedSigned by 6 directors

Attendance

The last four meetings

83%100%67%83%
Meeting
M/2026/04
Minutes
Signing 4 of 6
Presenter
Noura Saad Al-QahtaniSecretary to the Board of Managers

Windows

Editing in a side sheet; a short question in a centred dialog

Timeline

  1. The secretary sent the invitation

  2. The chair approved the agenda

  3. Eng. Ahmed Al-Dosari uploaded the performance report

People

People are circles — the only round thing on the drawing

Noura Saad Al-QahtaniSecretary to the Board of ManagersEng. Abdulaziz Fahd Al-RashedChair of the Board of ManagersDr. Sultan Nasser Al-OtaibiVice Chair of the Board of ManagersNoura Saad Al-QahtaniEng. Abdulaziz Fahd Al-RashedDr. Sultan Nasser Al-OtaibiDr. Haifa Mohammed Al-ZahraniKhalid Ibrahim Al-SubaieMajed Ali Al-HarbiEng. Ahmed Saleh Al-DosariLama Faisal Al-MutairiEng. Faisal Turki Al-ShammariEng. Yousef Adel Al-OmariAbdullah Mohammed Al-AnaziReem Abdulrahman Al-ShehriEng. Saud Khalid Al-QarniNouf Abdullah Al-GhamdiTurki Saad Al-BaqamiDr. Munira Hamad Al-AbdulkarimEng. Badr Nasser Al-HamdanWaleed Omar BaeshenHind Sulaiman Al-Rasheed

Empty state

No decisions waiting for a vote

When the chair opens a vote it shows here, and you are notified.

Charts

Ultramarine for the first series, then graphite, then stone green

Attendance per meeting

Directors present

  • In person
  • Remote

Decisions by state

30

Total

  • Done18⁦60%⁩
  • In progress9⁦30%⁩
  • Late3⁦10%⁩

Data table

⁦19⁩ results
Export to Excel
Roles
Noura Saad Al-QahtaniSecretary to the Board of ManagersSecretary to the Board of ManagersBoard secretary
Eng. Abdulaziz Fahd Al-RashedChair of the Board of ManagersChair of the Board of ManagersChair, Director
Dr. Sultan Nasser Al-OtaibiVice Chair of the Board of ManagersVice Chair of the Board of ManagersVice chair, Director
Dr. Haifa Mohammed Al-ZahraniIndependent directorIndependent directorDirector
Khalid Ibrahim Al-SubaieNon-executive directorNon-executive directorDirector
Majed Ali Al-HarbiGroup Chief Financial OfficerGroup Chief Financial OfficerPresenter / guest
Eng. Ahmed Saleh Al-DosariHead of Projects & DevelopmentHead of Projects & DevelopmentAction owner
Lama Faisal Al-MutairiHead of Internal AuditHead of Internal AuditInternal auditor
Eng. Faisal Turki Al-ShammariHead of Information TechnologyHead of Information TechnologyTechnical administrator
Eng. Yousef Adel Al-OmariPlatform Operations Manager — the service providerPlatform Operations Manager — the service providerPlatform operator
⁦1⁩–⁦10⁩ of ⁦19⁩