Screen map
Every screen of the system, grouped by the group that builds it, with a link to a real record for every dynamic route. “Who opens it” is the roles that reach it.
113 screens in 9 groups
A screen opens through the current persona’s eyes; pick a suitable persona first when needed.
Home, inbox, sign-in & the director’s app15
| Screen | Surface | Who opens it | In the offer | Status | Route |
|---|---|---|---|---|---|
| Sign in Sign in with a password, through Nafath or the company’s single sign-on. | Sign-in | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator, Platform operator | 07 §1 | Built | /sign-in |
| Two-step verification A code from the authenticator app, Nafath or a passkey — required for every user, with a trusted device remembered. | Sign-in | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator, Platform operator | 07 §1 | Built | /sign-in/verify |
| Recover access Lost your device or factor: a verified request the technical administrator handles. | Sign-in | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator, Platform operator | 07 §1 | Built | /sign-in/recovery |
| Home What is yours today, by your role: the next meeting, what waits for your reading, vote and signature, your actions. | Board platform | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator | 00 §4.1 · 06 §1 | Built | /home |
| Waiting for me Everything that needs you, overdue first: an invitation, a paper, a vote, a signature, an action, a declaration. | Board platform | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator | 06 §1 | Built | /inbox |
| Notifications Every invitation, paper, vote, signature and reminder you received, read or not. | Board platform | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator | 06 §1 | Built | /notifications |
| Calendar The meetings of the board, its committees and the subsidiaries, and the statutory dates — Hijri and Gregorian. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 02 §1 | Built | /calendar |
| Messages Secure messages between the secretariat and the members, with read receipts and acknowledgements. | Board platform | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner | 06 §2 | Built | /messages |
| Conversation One subject’s messages, who read them and who acknowledged. | Board platform | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner | 06 §2 | Built | /messages/[id] |
| Search Search the meetings, decisions, documents and actions — only within what you may see. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 03 §14 | Built | /search |
| My account Your details, picture, language and preferred calendar. | Board platform | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator | 06 §1 · 07 §1 | Built | /account |
| Notification preferences The channels per kind of notification, the daily digest, quiet hours. | Board platform | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator | 06 §1 | Built | /account/notifications |
| Security & devices Your factor, trusted devices and sessions; end a session or remove a device. | Board platform | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator | 07 §1 · §2 | Built | /account/security |
| My items to present For a guest presenter: only their item, what is asked and by when, the upload, the questions — access ends after the meeting. | Board platform | Presenter / guest, Board secretary | 01 §8 · 02 §8 | Built | /presenter |
| Director’s app The iPad and phone experience: the next meeting, the briefcase, voting and signing at a touch. | Board platform | Board secretary, Chair, Vice chair, Director | 06 §4 | Built | /app |
Bodies, members, users & security16
| Screen | Surface | Who opens it | In the offer | Status | Route |
|---|---|---|---|---|---|
| Group structure The holding, its subsidiaries and their bodies: the board, the committees, the subsidiaries’ boards, the partners. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 01 §2 | Built | /structure |
| Bodies Each body: its composition and seats, its term, its quorum and majority rules, its meetings. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 01 §2 · §3 | Built | /bodies |
| Body The current composition, the term and its end, the composition check (independents, vacancies), the meetings and decisions. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 01 §3 | Built | /bodies/[id] |
| Quorum & voting rules The body’s quorum, majority, circulation, proxy and remote rules — dated versions and each rule’s source. | Board platform | Board secretary, Internal auditor | 04 §16 · 02 §13 | Built | /bodies/[id]/rules |
| Members The members’ directory: their capacity on each body, independence, attendance. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 01 §5 | Built | /members |
| Member profile Memberships and terms, cumulative attendance, declarations and disclosures, delegations. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 01 §5 · §10 | Built | /members/[id] |
| Terms & memberships The bodies’ terms and their end, memberships ending soon, renewals. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 01 §4 | Built | /terms |
| Declarations The yearly declarations (conflicts, confidentiality, independence): what is asked of you, who is late. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 01 §10 · 05 §8 | Built | /declarations |
| Declaration campaign The campaign’s progress: who submitted, who is late, reminders, the review. | Board platform | Board secretary, Internal auditor | 01 §10 | Built | /declarations/[id] |
| Interests & conflicts register The members’ standing disclosures, the conflicts declared on items, the withheld items. | Board platform | Board secretary, Internal auditor | 01 §10.1 · §10.4 | Built | /disclosures |
| Delegations A temporary delegation of the chair’s powers to the vice chair, with its period and reason. | Board platform | Board secretary, Chair, Vice chair | 01 §9 | Built | /delegations |
| Users Accounts, their roles and states, the licensed seats, invitations. | Board platform | Technical administrator, Board secretary | 01 §4 · 07 §3 | Built | /admin/users |
| User account Roles, account state, two-step sign-in, devices, sessions. | Board platform | Technical administrator, Board secretary | 01 §4 | Built | /admin/users/[id] |
| Devices iPads, phones and browsers, the briefcases on them, remote wipe. | Board platform | Technical administrator | 07 §2 · 06 §4 | Built | /admin/devices |
| Security policy Two-step sign-in, session timeouts, offline reading, the rules of each classification. | Board platform | Technical administrator | 07 §1–§3 | Built | /admin/security |
| Support access The provider’s temporary access requests: scope and hours, approve or reject, what was done. | Board platform | Technical administrator | 07 §15 · 08 ADM-P | Built | /admin/access |
Meeting preparation & the statutory calendar13
| Screen | Surface | Who opens it | In the offer | Status | Route |
|---|---|---|---|---|---|
| Meetings Every body’s meetings: upcoming, in preparation, held — and each one’s readiness. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 02 §2 | Built | /meetings |
| New meeting The wizard: body, type, time, place or link, copy an earlier meeting or a template, the standing items. | Board platform | Board secretary | 02 §3 | Built | /meetings/new |
| Meeting The meeting’s path from preparation to closing, the invitation and the answers, readiness, the expected quorum. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor, Presenter / guest | 02 §2–§12 | Built | /meetings/[id] |
| Agenda Items, sub-items and standing items: type, presenter, minutes, draft resolution, confidentiality — and the chair’s approval. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor, Presenter / guest | 02 §4–§6 | Built | /meetings/[id]/agenda |
| Item The item’s description, draft resolution, presenter, materials, the members’ questions, who it is withheld from. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor, Presenter / guest, Action owner | 02 §5 · 01 §10 | Built | /items/[id] |
| Material requests What each presenter owes and by when, what is uploaded, reviewed or late, reminders. | Board platform | Board secretary, Internal auditor | 02 §7 · 03 §5 | Built | /meetings/[id]/materials |
| Invitations & answers The invitees and their answers (attend, apologise, proxy), reminders, the expected quorum. | Board platform | Board secretary, Internal auditor | 02 §9–§10 | Built | /meetings/[id]/invitations |
| Conflict check Items’ parties matched against the members’ disclosures; withhold an item from a conflicted member. | Board platform | Board secretary, Chair, Vice chair, Internal auditor | 01 §10.4 · 02 §5 | Built | /meetings/[id]/conflicts |
| Meeting templates Agenda, invitation and minutes templates per body and meeting type. | Board platform | Board secretary | 02 §3 · 08 | Built | /meetings/templates |
| Annual plan The year’s planned meetings and their topics, the chair’s approval. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 02 §1 | Built | /plans/[id] |
| Statutory deadlines Statutory and contractual dates (statements, budget, partners’ call, term end) and their reminders. | Board platform | Board secretary, Chair, Vice chair, Internal auditor | 02 §1 · MTG-005 | Built | /deadlines |
| Polls Pick a date for a meeting or workshop, quick polls of the members. | Board platform | Board secretary, Chair, Vice chair, Director | 05 §7 | Built | /polls |
| Poll The options and answers (yes / maybe / no), the best date. | Board platform | Board secretary, Chair, Vice chair, Director | 05 §7 | Built | /polls/[id] |
Meeting day & voting8
| Screen | Surface | Who opens it | In the offer | Status | Route |
|---|---|---|---|---|---|
| Session console The secretary’s live mode: attendance and the live quorum, the current item, notes, votes, conflicts. | Board platform | Board secretary | 02 §13 | Built | /meetings/[id]/live |
| Chair’s console Run the items, open and close the votes, rule on conflicts, the casting vote. | Board platform | Chair, Vice chair | 02 §13 · 04 §11 | Built | /meetings/[id]/chair |
| The session on my device For a director in the meeting: the current item and its papers, voting, declaring a conflict. | Board platform | Board secretary, Chair, Vice chair, Director | 02 §13 · 06 §4 | Built | /meetings/[id]/room |
| Boardroom screen On the boardroom screen: the current item, the time, the quorum, the vote result. | Board platform | Board secretary | 02 §13 | Built | /meetings/[id]/screen |
| Attendance Check-ins (in person / remote / by proxy) and leaving, and their effect on the quorum. | Board platform | Board secretary, Chair, Vice chair, Internal auditor | 02 §13.2 | Built | /meetings/[id]/attendance |
| Vote The ballot: for, against, abstain, for with a reservation — with the second factor. | Board platform | Board secretary, Chair, Vice chair, Director | 04 §11 | Built | /votes/[id] |
| Vote result The result and how it was counted under the body’s rules, the reservations, who voted (never how in a secret ballot). | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 04 §11 · §16 | Built | /votes/[id]/result |
| Meeting on the iPad The meeting on the iPad before and during: the agenda, the papers, the answer, the vote. | Board platform | Board secretary, Chair, Vice chair, Director | 06 §4 | Built | /app/meetings/[id] |
Documents, the board pack & the AI assistant15
| Screen | Surface | Who opens it | In the offer | Status | Route |
|---|---|---|---|---|---|
| Board pack The papers in agenda order with the index and page numbers, versions, the chair’s approval, publication. | Board platform | Board secretary, Chair, Vice chair, Internal auditor | 03 §8 | Built | /meetings/[id]/pack |
| Read the pack The whole pack with its index, what you read, what changed since you did. | Board platform | Board secretary, Chair, Vice chair, Director | 03 §8 · §10 | Built | /meetings/[id]/pack/read |
| Document viewer The secure viewer with your name and the time as a watermark, your private notes, download and print by classification. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor, Presenter / guest, Action owner | 03 §10 · §11 | Built | /documents/[id] |
| Document details Versions and changed pages, classification, read receipts. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 03 §6 · §13 | Built | /documents/[id]/info |
| Compare versions What changed between two versions of the paper, page by page. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 03 §6 | Built | /documents/[id]/compare |
| Archive & search Every document open to you with full-text search, classification, body and year. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 03 §14 | Built | /documents |
| Reference library The articles, charters, policies, strategy and statements, with their effective and review dates. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 03 §12 | Built | /library |
| Library section The section’s documents, their issues in force and superseded. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 03 §12 | Built | /library/[id] |
| Read receipts Who opened each paper, when and how far, and each director’s read rate. | Board platform | Board secretary, Chair, Vice chair, Internal auditor | 03 §13 | Built | /meetings/[id]/reads |
| Questions on the papers The members’ questions before the meeting and the presenters’ answers, or deferral to the session. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor, Presenter / guest, Action owner | 03 §11.3 | Built | /meetings/[id]/questions |
| My notes Your highlights and private notes across every paper, and what you shared. | Board platform | Board secretary, Chair, Vice chair, Director | 03 §11 | Built | /annotations |
| Reader on the iPad Reading with touch and pencil, notes, keeping for offline reading. | Board platform | Board secretary, Chair, Vice chair, Director | 06 §4 · 03 §10 | Built | /app/reader/[id] |
| Briefcase The papers kept on your device and how long they stay offline. | Board platform | Board secretary, Chair, Vice chair, Director | 06 §4 · 07 §2 | Built | /app/briefcase |
| AI assistant Summaries, questions on the papers, minutes drafts — optional and by the company’s consent; every output a draft to review. | Board platform | Board secretary, Chair, Vice chair, Director | 06 §6 | Built | /assistant |
| AI assistant settings The subscription, the written consent, the enabled features, the bodies and the highest classification allowed. | Board platform | Technical administrator, Board secretary | 06 §6 · 07 §9 | Built | /admin/ai |
Minutes, decisions & circulation12
| Screen | Surface | Who opens it | In the offer | Status | Route |
|---|---|---|---|---|---|
| Minutes Every body’s minutes and their stages: draft, review, approval, signing, sealed. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 04 §1 | Built | /minutes |
| Minutes The minutes per item, the members’ comments and replies, the chair’s approval, the signing progress. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 04 §2–§5 | Built | /minutes/[id] |
| Edit the minutes Write the summary and the resolutions from the session notes, with versions. | Board platform | Board secretary | 04 §2 | Built | /minutes/[id]/edit |
| Sign the minutes Sign electronically with the second factor, sign with a reservation, or decline with a reason. | Board platform | Board secretary, Chair, Vice chair, Director | 04 §6–§7 | Built | /minutes/[id]/sign |
| Sealed minutes The final copy with its serial number, fingerprint and signatures — immutable. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 04 §8 | Built | /minutes/[id]/sealed |
| Decisions register Every decision with its number, date, source, category, result and status, and the actions it produced. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor, Action owner | 04 §9 | Built | /decisions |
| Decision The text, the result and reservations, the decisions that amended or cancelled it, its actions and extracts. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor, Action owner | 04 §9–§10 | Built | /decisions/[id] |
| Decision extract A certified extract for a third party, with a verification code. | Board platform | Board secretary, Internal auditor | 04 §10 | Built | /decisions/[id]/extract |
| Resolutions by circulation Resolutions by circulation: voting, passed, and waiting for ratification at the next meeting. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 04 §12 | Built | /circulations |
| New circulation The wording, rationale, attachments and deadline, excluding the conflicted, sent to the chair. | Board platform | Board secretary | 04 §12 | Built | /circulations/new |
| Resolution by circulation The electronic vote with justifications, the automatic result, a request to deliberate, ratification. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 04 §12 | Built | /circulations/[id] |
| Verify a document A public page: verify minutes or an extract by its code — valid, withdrawn or unknown. | Sign-in | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator, Platform operator | 04 §8 · §10 | Built | /verify/[id] |
Follow-up, reports, evaluation & audit12
| Screen | Surface | Who opens it | In the offer | Status | Route |
|---|---|---|---|---|---|
| Actions The decisions’ actions: owner, due date, progress — the overdue and the escalated. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor, Action owner, Presenter / guest | 05 §1–§3 | Built | /actions |
| Action Updates and evidence, an extension request, closing after review, the escalation ladder. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor, Action owner, Presenter / guest | 05 §2–§6 | Built | /actions/[id] |
| Decisions follow-up The standing item «follow-up of previous decisions» per body: open, overdue and closed since the last meeting. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 05 §4 · 02 §5 | Built | /followup |
| Governance dashboard Meetings and attendance, packs on time, minutes signed, decisions, actions, declarations. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 05 §9 | Built | /dashboard |
| Reports Ready reports to export to Excel and PDF by body and period. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 05 §9 | Built | /reports |
| Report The report with its filters; every export recorded in the audit log. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 05 §9 | Built | /reports/[id] |
| Annual governance report The draft governance chapter of the annual report: composition, meetings, attendance, committees, decisions. | Board platform | Board secretary, Chair, Vice chair, Internal auditor | 05 §9 · RPT | Built | /reports/annual |
| Attendance report Each member’s attendance on each body over the year: in person, remote, by proxy, apologies. | Board platform | Board secretary, Chair, Vice chair, Director, Internal auditor | 05 §9 | Built | /reports/attendance |
| Board evaluation The yearly evaluation cycles of the board and its committees — confidential and aggregated. | Board platform | Board secretary, Chair, Vice chair, Director | 05 §7 | Built | /evaluations |
| Evaluation results The aggregated results per axis — never shown below the minimum responses. | Board platform | Board secretary, Chair, Vice chair, Director | 05 §7 | Built | /evaluations/[id] |
| Answer the evaluation The questionnaire without a name: who took part is known, never what they answered. | Board platform | Board secretary, Chair, Vice chair, Director | 05 §7 | Built | /evaluations/[id]/answer |
| Audit log Every open, edit, vote, signature, export and refused attempt — with device and time, in a chain nobody can alter. | Board platform | Internal auditor, Board secretary, Technical administrator | 07 §10 | Built | /audit |
Company settings & the platform console16
| Screen | Surface | Who opens it | In the offer | Status | Route |
|---|---|---|---|---|---|
| Company settings The company’s identity, labels, default deadlines, escalation ladder and calendar. | Board platform | Technical administrator, Board secretary | 08 · 01 §2 | Built | /settings |
| Notification settings The channels available, what external messages disclose, quiet hours. | Board platform | Technical administrator, Board secretary | 06 §1 | Built | /settings/notifications |
| Integrations E-mail, SMS, calendar, Teams, Nafath, single sign-on, e-signature — their state and what leaves for them. | Board platform | Technical administrator | 08 INT | Built | /admin/integrations |
| Subscription & invoices The plan, seats used, add-ons and storage, the invoices and the renewal quote. | Board platform | Technical administrator, Board secretary | 08 BIL · ADM-C | Built | /admin/subscription |
| Support Support tickets with the provider, their severity and response times. | Board platform | Technical administrator, Board secretary | 08 SRV | Built | /support |
| Support ticket The conversation with support, the ticket’s state, its access requests. | Board platform | Technical administrator, Board secretary | 08 SRV | Built | /support/[id] |
| Platform console The platform’s clients, their subscriptions and invoices, service levels and support. | Platform console | Platform operator | 08 §1 | Built | /platform |
| Tenants Subscribing organisations, their plans, seats, state and usage — never their boards’ content. | Platform console | Platform operator | 08 ADM-P | Built | /platform/tenants |
| Tenant Subscription, seats, add-ons, invoices and tickets, the state (never suspended before a scheduled meeting). | Platform console | Platform operator | 08 ADM-P · BIL | Built | /platform/tenants/[id] |
| Invoices Tax invoices and credit notes, 15% VAT, payments and the overdue. | Platform console | Platform operator | 08 BIL | Built | /platform/invoices |
| Invoice The invoice’s lines, VAT, total, payments and its e-invoicing state. | Platform console | Platform operator | 08 BIL | Built | /platform/invoices/[id] |
| Quotes Price and renewal quotes and their validity. | Platform console | Platform operator | 08 BIL | Built | /platform/quotes |
| Price list Plans, additional seats, limited accounts, storage and the AI assistant. | Platform console | Platform operator | 08 BIL | Built | /platform/pricing |
| Service levels Monthly availability against 99.9%, incidents, the credits due. | Platform console | Platform operator | 08 SLA | Built | /platform/sla |
| Support tickets Every tenant’s tickets, their severity and response time against target. | Platform console | Platform operator | 08 SRV | Built | /platform/tickets |
| Ticket Reply to the client; ask for a temporary access of a set scope and hours. | Platform console | Platform operator | 08 SRV · 07 §15 | Built | /platform/tickets/[id] |
Foundation6
| Screen | Surface | Who opens it | In the offer | Status | Route |
|---|---|---|---|---|---|
| Choose a persona Each card opens the platform through its owner’s eyes. | Start | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator, Platform operator | — | Built | / |
| Components The components and colours, live on the demo data. | System | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator, Platform operator | — | Built | /design-system |
| Screen map Every screen of the platform, who builds it and its state. | System | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator, Platform operator | — | Built | /design-system/map |
| Reference: home The visual direction of the home on illustrative data: one hero card, one action. | System | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator | — | Built | /design-system/reference/home |
| Reference: meeting workspace The visual direction of the meeting workspace on illustrative data. | System | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator | — | Built | /design-system/reference/meeting |
| Reference: meeting room The visual direction of the live meeting room on illustrative data. | System | Board secretary, Chair, Vice chair, Director, Presenter / guest, Action owner, Internal auditor, Technical administrator | — | Built | /design-system/reference/room |
